A.N.A.S.
Dolomiti Strade
Arsiè
Italy
09 2025 > 11 2025
The project concerns the hydraulic safety upgrading of the Arsiè tunnel, where the presence of an adjacent aquifer was causing infiltration inside the structure. The work involved the construction of a new drainage system to collect and convey the groundwater, solving the problem once and for all.
For this job, Martoni was chosen, supplying its PP-HM drainage pipes, ideal for tunnel applications thanks to their high mechanical strength and long durability.
A decisive factor in the choice was the type of slotting obtained by milling rather than by blade cutting, a process that ensures precise cuts, reduces stress on the material and improves wear resistance during chain cleaning operations.

Diameter: 500mm
Total length: 500m
Slotting: 360 degrees
In this section we present some of our most representative case studies to show how Martoni PVC‑U and PP‑HM pipes and fittings are successfully used in real projects in the sewerage, building, infrastructure and telecommunications sectors. Through real examples, we share the value of our solutions in terms of quality, reliability and sustainability. Each project bears witness to our ability to support clients, designers and contractors with certified products and technical assistance attentive to the needs of the construction site and of regulations.
Follow our LinkedIn page to stay up to date
Martoni utilizza materiale plastico riciclato certificato fino al 35% nei propri sistemi di tubazioni, senza compromessi sulle prestazioni.