Asfinag
Strabag
Eisentratten – Gmünd
Austria
03 2025 > 11 2026
23.5 million euros
The project involves the complete renovation of a stretch of approximately three kilometres of the A10 Tauernautobahn motorway, between Eisentratten and Gmünd, which includes both the resurfacing of the carriageway and the structural restoration of two existing bridges. As part of these works, a new stormwater collection and drainage system is being built, channelling platform water to dedicated environmental protection facilities (GSA) and then discharging it in a controlled manner into the receiving watercourses. The project also provides for the strengthening of the load-bearing structures of the bridges, the upgrading of the road surface, and the renewal of waterproofing and edge elements.
A further aspect is the construction of new noise barriers along a stretch of approximately two kilometres, to protect the neighbouring residential areas. For water management, Martoni supplied more than 2,600 metres of PP MITO SN12 polypropylene pipes, with diameters from DN200 to DN630, as well as specific fittings, thus ensuring a reliable and durable infrastructure for the drainage and transport of stormwater within the works.

Diameter: 200 > 630mm
Total length: 2,670m
In this section we present some of our most representative case studies to show how Martoni PVC‑U and PP‑HM pipes and fittings are successfully used in real projects in the sewerage, building, infrastructure and telecommunications sectors. Through real examples, we share the value of our solutions in terms of quality, reliability and sustainability. Each project bears witness to our ability to support clients, designers and contractors with certified products and technical assistance attentive to the needs of the construction site and of regulations.
Follow our LinkedIn page to stay up to date
Martoni utilizza materiale plastico riciclato certificato fino al 35% nei propri sistemi di tubazioni, senza compromessi sulle prestazioni.